Applications to investigate
- bottles and tubes
- sachets
- trays and blisters
- dry products
Customer equipment selection guide
Carton erection, product loading, closing, coding and inspection around the primary pack or direct-fill product.
Carton erection, product loading, closing, coding and inspection around the primary pack or direct-fill product. The product name alone is not enough to select machinery: viscosity, particles, foam, temperature, aeration, chemical compatibility and pack tolerance can change the correct solution.
| Configuration | Selection note |
|---|---|
| carton erection | Confirm the final specification using the real product, pack, output and cleaning method. |
| product collation | Confirm the final specification using the real product, pack, output and cleaning method. |
| tuck or glue closing | Confirm the final specification using the real product, pack, output and cleaning method. |
| coding and inspection | Confirm the final specification using the real product, pack, output and cleaning method. |
Record the complete dose range, product condition at the point of filling, container and closure drawings, real samples, intended labels, target output and every planned recipe or pack change. State whether output is a maximum instantaneous speed or a sustained sellable rate after refilling, minor stops, rejects and operator intervention.
Review the full process rather than the filler in isolation. Container preparation, feeding, dosing, filling, capping or sealing, labelling, coding, inspection, reject handling, conveying, accumulation and secondary packaging can each become the bottleneck. The layout also needs guards, maintenance access, cleaning access, utilities, raw-material movement and finished-goods movement.
A useful machinery trial challenges the difficult edges of the requirement: minimum and maximum dose, warmest and coldest product, largest expected particles, highest foam risk and packs from more than one supplier batch. Record settings, output, accuracy or presentation results, cleaning observations and open points. Those results should feed into a written factory acceptance test.
The strongest starting applications include bottles and tubes, sachets, trays and blisters and dry products. The final choice still depends on a representative product and pack trial.
Provide product behaviour at the real filling temperature, minimum and maximum dose, target sustained output, container and closure samples, cleaning method, utilities and available space.
Test board curl, leaflet insertion, product count and glue and flap verification, together with achievable output, repeatability, changeover and cleaning.
Yes. Container preparation, filling, closing, labelling, coding, inspection, reject handling and accumulation need to work as one balanced process.
Often it can, but future container formats, nozzle pitch, conveyor height, controls, guarding and upstream or downstream automation should be considered during the first specification.