Specification, safety and validation

Plan the evidence as well as the equipment.

Use current official sources and project-specific competent assessment for machinery supply, workplace use, explosive atmospheres, quantity control, guarding, cleaning and acceptance.

ImportantThese pages help buyers and project teams structure questions and records. They are not legal, regulatory, food-safety or machinery-safety advice for a specific installation.

9 project guides

Connect the application, machinery and site responsibilities.

Compliance cannot be added at the end of a project. The product, pack, process, environment, interfaces and intervention tasks should be reflected in the original specification and acceptance plan.

UK planning guide

PUWER planning for packaging machinery

PUWER duties apply to organisations that own, operate or control work equipment. Machinery must be suitable, maintained, inspected where required and used by trained people with effective controls for dangerous parts.

Open the planning guide →
UK planning guide

CE and UKCA planning for packaging machinery

For machinery placed on the Great Britain market, check the current Supply of Machinery (Safety) Regulations guidance and the applicable conformity route. Current government guidance recognises both CE and UKCA routes for machinery in Great Britain, subject to the relevant requirements.

Open the planning guide →
UK planning guide

DSEAR and explosive-atmosphere planning for filling lines

Where flammable liquids, vapours, gases or combustible dusts may create fire or explosion risk, the employer must assess and control the dangerous-substance risk. Equipment selection follows the classified environment and the complete process, not the product name alone.

Open the planning guide →
UK planning guide

Packaged goods average-system planning

Packers using the average system must control the batch against the three packers rules, use suitable equipment and retain required records. Filling-machine accuracy alone is not the complete quantity-control system.

Open the planning guide →
UK planning guide

Machine guarding and packaging-line risk assessment

Guarding should follow risk reduction by design and prevent access to dangerous parts while allowing safe production, cleaning, setting, fault recovery and maintenance. The complete integrated line must be assessed, not only each standalone machine.

Open the planning guide →
UK planning guide

Filling-machine user requirement specification (URS)

A URS turns a product and packaging need into testable machinery requirements. It should state the operating window, interfaces, utilities, safety, cleaning, data, documentation and measurable acceptance criteria without dictating unnecessary design detail.

Open the planning guide →
UK planning guide

Factory acceptance testing for packaging machinery

A factory acceptance test should demonstrate the agreed functions and performance with representative product and packaging before dispatch. The protocol must define the run boundary, samples, measurements, pass criteria, deviations and open actions.

Open the planning guide →
UK planning guide

Cleaning validation and allergen-changeover planning

Cleaning requirements should be defined from the product hazards, residue, allergen or chemical cross-contamination risk and the equipment design. A fast changeover is acceptable only when the validated clean and line-clearance result is maintained.

Open the planning guide →
UK planning guide

Food-contact material planning for packaging lines

Product-contact machinery parts, hoses, seals, lubricants and packaging materials must be suitable for their intended food contact, temperature, time and cleaning conditions. Supplier declarations should match the actual application.

Open the planning guide →