Start with responsibility and intended use
For machinery placed on the Great Britain market, check the current Supply of Machinery (Safety) Regulations guidance and the applicable conformity route. Current government guidance recognises both CE and UKCA routes for machinery in Great Britain, subject to the relevant requirements. Define who supplies, integrates, installs, owns and uses the equipment, and record the final product, packaging, environment, operator tasks and maintenance interventions. A generic certificate or checklist cannot replace that project-specific scope.
Questions for the project team
- Who is the responsible person for the complete supplied machine or assembly?
- Is the equipment complete machinery or partly completed machinery?
- Which essential health and safety requirements and standards basis apply?
- Are the declaration, technical documentation, instructions and marking consistent with the delivered configuration?
Documents and evidence to plan
The exact records depend on the project, but the following deliverables provide a practical starting structure:
- documented scope and responsibility matrix
- risk assessment and technical file inputs
- declaration of conformity or incorporation as applicable
- instructions in the required language
- marking and identification matched to the delivered equipment
Apply the controls across the machinery lifecycle
Review the requirement during specification, supplier selection, design review, factory testing, installation, site acceptance, training, routine operation, cleaning, maintenance and modification. A change that appears small—such as a new solvent, bottle size, cap, guarding opening, extraction system or line speed—can alter the original risk or conformity basis.
Current official sources
Use the official sources below as the starting point and check their update dates when the project is reviewed.
- GOV.UK: Supply of Machinery (Safety) Regulations 2008 — Great Britain ↗
- GOV.UK: placing UKCA or CE marked products on the GB market ↗
- Legislation.gov.uk: Supply of Machinery (Safety) Regulations 2008 ↗
Common questions
What is the starting point for ce and ukca planning for packaging machinery?
For machinery placed on the Great Britain market, check the current Supply of Machinery (Safety) Regulations guidance and the applicable conformity route. Current government guidance recognises both CE and UKCA routes for machinery in Great Britain, subject to the relevant requirements.
Does a conformity mark replace the user risk assessment?
No. Supply obligations and duties for safe installation, use, inspection, maintenance and workplace risk control are related but distinct.
Who should confirm the legal interpretation?
Use current official guidance and competent legal, safety, engineering, metrology or food-safety advice appropriate to the project and jurisdiction.
When should the assessment be reviewed?
Review it when equipment, product, packaging, formulation, process, controls, room layout, use or official requirements change, and after relevant incidents or findings.